NCR RealPOS 25 Terminal Site Preparation
Introduction
This document provides the information necessary to prepare a site to NCR specifications prior to installing an NCR RealPOS 25 terminal (also referred to as the NCR 7610). Prepare the site properly before installing the terminal because site preparation deficiencies may be difficult to detect and correct after installation.
Product IDs
Major Model |
CPU |
---|---|
7610-5020 |
Intel Atom D2550 Dual Core 1.86G Hz, 2 GB DDR3, Diskless |